Mac K6MAC and Mike K1NPT performed maintenance on nodes in the Cranston, RI area.  The solar controller reported the production of 108KWh over the last 12 months. The LiFePO4 battery appeared to be performing well. 

These nodes were deployed in Dec 2020 as part of an Eagle Scout project, the second such project in Rhode Island. 